The new headquarters contains 15,000 s/f of office space consisting of 5 new bathrooms, large break room, lunch room, locker rooms and server room. A contemporary building entrance was constructed for their sales and parts area along with a 2,000 s/f mezzanine. The new 45,000 s/f warehouse was equipped with cutting edge technology. The rede-signed space consists of new lighting; two isolation footings and foundations for two state of the art Vertical Lift Modules (VLM); all new sprinkler systems above and in rack systems for new 15,000 s/f mezzanine. Exterior work includes site work for parking, green space as well as an up-to-date 130LF exterior loading dock with new roof structure above and drive in loading dock.