Metropolitan Pipe
MANUFACTURING & ENGINEERING

Metropolitan Pipe

Metropolitan Pipe Relocation Project

Project Scope

Metropolitan Pipe decided to relocate their operations from Cambridge to Somerville after being in the Cambridge location for 70 years. The goal of this group was to redesign, customize and build this new facility to meet Metropolitan Pipe’s specific needs and business objectives. The project was designed with their customers in mind, to improve their entire customer experience.

Project Highlights

The new headquarters contains 15,000 s/f of office space consisting of 5 new bathrooms, large break room, lunch room, locker rooms and server room. A contemporary building entrance was constructed for their sales and parts area along with a 2,000 s/f mezzanine. The new 45,000 s/f warehouse was equipped with cutting edge technology. The rede-signed space consists of new lighting; two isolation footings and foundations for two state of the art Vertical Lift Modules (VLM); all new sprinkler systems above and in rack systems for new 15,000 s/f mezzanine. Exterior work includes site work for parking, green space as well as an up-to-date 130LF exterior loading dock with new roof structure above and drive in loading dock.

Download Information for
Metropolitan Pipe

Project Images

Project Media

Project Location

View Similar Projects